2017International Linear ColliderOpen access

HIE-ISOLDE SC Linac Progress and Commissioning in 2016

Walter Venturini Delsolaro, E. Bravin, N. Delruelle, Michal Elias, Eleftherios Fadakis, Jose Ferreira Somoza, F. Formenti, Matthew Fraser, Jean-Christophe Gayde, Nicolas Guillotin, Yacine Kadi, Guillaume Kautzmann, T. Koettig, Yann Leclercq, Michele Martino, Matej Mician, Akira Miyazaki, Eric Montesinos, V. Parma, José Rodríguez, Sergey Sadovich, E. Siesling, D. Smekens, Mathieu Therasse, Luca Valdarno, Daniel Valuch, G. Vandoni, U. Wagner, Pei Zhang

Open full text 0 citations

Abstract

The HIE-ISOLDE project (High Intensity and Energy ISOLDE) reached an important milestone in October 2015 when the first physics run was carried out with radioactive Zn beams at 4 MV/m. This is a first stage in the upgrade of the REX post-accelerator, whereby the energy of the radioactive ion beams was increased from 3 to 4.3 MeV per nucleon. The facility will ultimately be equipped with four high-beta cryomodules that will accelerate the beams up to 10 MeV per nucleon for the heaviest isotopes available at ISOLDE. The first cryomodule of the new linac, hosting five superconducting cavities and one solenoid, was commissioned in summer 2015, while the second one was being assembled in clean room. The new high-energy beam transfer lines were installed and commissioned in the same lapse of time. Commissioning with two cryomodules is planned for Summer 2016 to prepare for a physics run at 5.5 MeV/u in the second half of the year. This contribution will focus on the results of the commissioning and operation of the SC linac in 2015. Plans for the second phase of the HIE-ISOLDE project will be highlighted.

Open-access reader

About this research paper

What this paper is about

The HIE-ISOLDE project (High Intensity and Energy ISOLDE) reached an important milestone in October 2015 when the first physics run was carried out with radioactive Zn beams at 4 MV/m. This is a first stage in the upgrade of the REX post-accelerator, whereby the energy of the radioactive ion beams was increased from 3 to 4.3 MeV per nucleon. The facility will ultimately be equipped with four high-beta cryomodules that will accelerate the beams up to 10 MeV per nucleon for the heaviest isotopes available at ISOLDE. The first cryomodule of the new linac, hosting five superconducting cavities and one solenoid, was commissioned in summer 2015, while the second one was being assembled in clean room. The new high-energy beam transfer lines were installed and commissioned in the same lapse of time. Commissioning with two cryomodules is planned for Summer 2016 to prepare for a physics run at 5.5 MeV/u in the second half of the year. This contribution will focus on the results of the commissioning and operation of the SC linac in 2015. Plans for the second phase of the HIE-ISOLDE project will be highlighted.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The HIE-ISOLDE project (High Intensity and Energy ISOLDE) reached an important milestone in October 2015 when the first physics run was carried out with radioactive Zn beams at 4 MV/m. This is a first stage in the upgrade of the REX post-accelerator, whereby the energy of the radioactive ion beams was increased from 3 to 4.3 MeV per nucleon. The facility will ultimately be equipped with four high-beta cryomodules that will accelerate the beams up to 10 MeV per nucleon for the heaviest isotopes available at ISOLDE. The first cryomodule of the new linac, hosting five superconducting cavities and one solenoid, was commissioned in summer 2015, while the second one was being assembled in clean room. The new high-energy beam transfer lines were installed and commissioned in the same lapse of time. Commissioning with two cryomodules is planned for Summer 2016 to prepare for a physics run at 5.5 MeV/u in the second half of the year. This contribution will focus on the results of the commissioning and operation of the SC linac in 2015. Plans for the second phase of the HIE-ISOLDE project will be highlighted.

Key concepts: Linear particle accelerator, Physics, Beam (structure), Optics

Related papers