2015International Linear ColliderOpen access

Status of HIE-ISOLDE SC Linac Upgrade

A. Sublet, L Alberty, Kurt Artoos, S. Calatroni, Ofelia Capatina, Matthew Fraser, Noémie Jecklin, Yacine Kadi, P. Maesen, G. Rosaz, Karl Schirm, M. Taborelli, Mathieu Therasse, Walter Venturini Delsolaro, Pei Zhang

Open full text 2 citations

Abstract

The HIE-ISOLDE upgrade project at CERN aims at increasing the energy of radioactive beams from 3MeV/u up to 10 MeV/u with mass-to-charge ratio in the range 2.5-4.5. The objective is obtained by replacing part of the existing normal conducting linac with superconducting Nb/Cu cavities. The new accelerator requires the production of 32 superconducting cavities in three phases: 10 high-beta cavities for phase 1 (2016), 10 high-beta cavities for phase 2 (2017) and possibly 12 low-beta cavities for phase 3 (2020). Half of the phase 1 production is completed with 5 quarter-wave superconducting cavities ready to be installed in the first cryomodule. The status of the cavity production and the RF performance are presented. The optimal linac working configuration to minimize cryogenic load and maximize accelerating gradient is discussed.

Open-access reader

About this research paper

What this paper is about

The HIE-ISOLDE upgrade project at CERN aims at increasing the energy of radioactive beams from 3MeV/u up to 10 MeV/u with mass-to-charge ratio in the range 2.5-4.5. The objective is obtained by replacing part of the existing normal conducting linac with superconducting Nb/Cu cavities. The new accelerator requires the production of 32 superconducting cavities in three phases: 10 high-beta cavities for phase 1 (2016), 10 high-beta cavities for phase 2 (2017) and possibly 12 low-beta cavities for phase 3 (2020). Half of the phase 1 production is completed with 5 quarter-wave superconducting cavities ready to be installed in the first cryomodule. The status of the cavity production and the RF performance are presented. The optimal linac working configuration to minimize cryogenic load and maximize accelerating gradient is discussed.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The HIE-ISOLDE upgrade project at CERN aims at increasing the energy of radioactive beams from 3MeV/u up to 10 MeV/u with mass-to-charge ratio in the range 2.5-4.5. The objective is obtained by replacing part of the existing normal conducting linac with superconducting Nb/Cu cavities. The new accelerator requires the production of 32 superconducting cavities in three phases: 10 high-beta cavities for phase 1 (2016), 10 high-beta cavities for phase 2 (2017) and possibly 12 low-beta cavities for phase 3 (2020). Half of the phase 1 production is completed with 5 quarter-wave superconducting cavities ready to be installed in the first cryomodule. The status of the cavity production and the RF performance are presented. The optimal linac working configuration to minimize cryogenic load and maximize accelerating gradient is discussed.

Key concepts: Linear particle accelerator, Upgrade, Physics, Computer science, Operating system, Optics, Beam (structure)

Related papers

Back to paper searchBrowse research topicsOriginal source