2012Wuhan Daxue xuebao. Xinxi kexue banRequires access

Automatic Guidance Technique of Pipe Replaced by Box Culvert Jacking Process in Underground 3D Traffic

Peng Zhang

Open publisher page 0 citations

Abstract

In order to adapt new underground 3D traffic method of pipe replaced by box culvert jacking process,a set of automatic guidance system based on total station was developed.This paper introduced the principle and key techniques of this system,and combined with successful application of culvert jacking highway under the existing railway project in Shanghai Jinshan.In actual construction this system proved to be excellent and have the following features:automatic,reliable,accurate,and it could provide real-time deviation for correction to achieve information construction.

About this research paper

What this paper is about

In order to adapt new underground 3D traffic method of pipe replaced by box culvert jacking process,a set of automatic guidance system based on total station was developed.This paper introduced the principle and key techniques of this system,and combined with successful application of culvert jacking highway under the existing railway project in Shanghai Jinshan.In actual construction this system proved to be excellent and have the following features:automatic,reliable,accurate,and it could provide real-time deviation for correction to achieve information construction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to adapt new underground 3D traffic method of pipe replaced by box culvert jacking process,a set of automatic guidance system based on total station was developed.This paper introduced the principle and key techniques of this system,and combined with successful application of culvert jacking highway under the existing railway project in Shanghai Jinshan.In actual construction this system proved to be excellent and have the following features:automatic,reliable,accurate,and it could provide real-time deviation for correction to achieve information construction.

Key concepts: Culvert, Jacking, Process (computing), Key (lock), Computer science, Set (abstract data type), Engineering, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Automatic Guidance Technique of Pipe Replaced by Box Culvert Jacking Process in Underground 3D Traffic — Research Paper | ScholarLens