Construction technology of the jacking culvert of existing lines
Tan Bo
Abstract
Tan Bo
Abstract
Combined with the jacking culvert construction of the 12th section of Zhejiang-Jiangxi Railway electrification transformation project,this paper introduces the technology of jacking culvert construction,and emphatically explains the slide plate of jacking culvert of existing lines,back construction,D-type auxiliary girder construction and the control measures in jacking process.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Combined with the jacking culvert construction of the 12th section of Zhejiang-Jiangxi Railway electrification transformation project,this paper introduces the technology of jacking culvert construction,and emphatically explains the slide plate of jacking culvert of existing lines,back construction,D-type auxiliary girder construction and the control measures in jacking process.
Key concepts: Jacking, Culvert, Engineering, Electrification, Civil engineering, Section (typography), Structural engineering, Computer science