2005Shanxi ArchitectureRequires access

The application of relaying method in jacking construction of box culvert

Wang Chao-ji

Open publisher page 0 citations

Abstract

Combined with practical jacking construction work of protection culvert, according to the relaying method the position design of jacking pick, selection of prefabrication site, fabrication of frame culvert and jacking construction are introduced. In addition, practical treatment measures are proposed to deal with the problems encountered in construction process.

About this research paper

What this paper is about

Combined with practical jacking construction work of protection culvert, according to the relaying method the position design of jacking pick, selection of prefabrication site, fabrication of frame culvert and jacking construction are introduced. In addition, practical treatment measures are proposed to deal with the problems encountered in construction process.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Combined with practical jacking construction work of protection culvert, according to the relaying method the position design of jacking pick, selection of prefabrication site, fabrication of frame culvert and jacking construction are introduced. In addition, practical treatment measures are proposed to deal with the problems encountered in construction process.

Key concepts: Jacking, Culvert, Prefabrication, Engineering, Civil engineering, Structural engineering, Art, Art history

Related papers

Back to paper searchBrowse research topicsOriginal source
The application of relaying method in jacking construction of box culvert — Research Paper | ScholarLens