The Construction Control Analysis of Long-span Cantilever Construction for Continuous Rigid Frame Bridge
OU Zhan-kai
Abstract
OU Zhan-kai
Abstract
With reference to the construction control of 440 m continuous rigid frame spans of Danshuihe Bridge,the analysis of the causes of deflection deformation of box girders in construction of long-span continuous rigid frame bridges are presented,necessity,methods,accuracy,some effective measures and results of the monitoring are presented. The closures of bridge are all finished naturally,and the closure errors are in the criterion value 2 cm.The deck alignment of completed stage is so smooth that it matches with the design alignment well. It ensures that the safety of the bridge construction,to provide references for similar projects.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
With reference to the construction control of 440 m continuous rigid frame spans of Danshuihe Bridge,the analysis of the causes of deflection deformation of box girders in construction of long-span continuous rigid frame bridges are presented,necessity,methods,accuracy,some effective measures and results of the monitoring are presented. The closures of bridge are all finished naturally,and the closure errors are in the criterion value 2 cm.The deck alignment of completed stage is so smooth that it matches with the design alignment well. It ensures that the safety of the bridge construction,to provide references for similar projects.
Key concepts: Rigid frame, Structural engineering, Cantilever, Deflection (physics), Deck, Bridge (graph theory), Girder, Engineering