2010Science Technology and EngineeringRequires access

Construction Monitoring and Control of Long-span Continuous Rigid Frame Bridge

Wang Wei-feng

Open publisher page 0 citations

Abstract

Taking the Dongjiangnan super span bridge for example,the purpose,load condition,simulation analysis,the alignment and stress control,parameter identification of construction monitoring and control for prestreesed concrete continuous rigid frame bridge are introduced.The measured data show that excellent effect are got by the monitoring method.

About this research paper

What this paper is about

Taking the Dongjiangnan super span bridge for example,the purpose,load condition,simulation analysis,the alignment and stress control,parameter identification of construction monitoring and control for prestreesed concrete continuous rigid frame bridge are introduced.The measured data show that excellent effect are got by the monitoring method.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Taking the Dongjiangnan super span bridge for example,the purpose,load condition,simulation analysis,the alignment and stress control,parameter identification of construction monitoring and control for prestreesed concrete continuous rigid frame bridge are introduced.The measured data show that excellent effect are got by the monitoring method.

Key concepts: Rigid frame, Bridge (graph theory), Span (engineering), Structural engineering, Frame (networking), Engineering, Control (management), Monitoring and control

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction Monitoring and Control of Long-span Continuous Rigid Frame Bridge — Research Paper | ScholarLens