Study on Optimization Project of the Dahuofang Reservoir Water Diversion Tunnel Engineering Construction by TBM

Zhi-qiang Shi

Open publisher page 0 citations

Abstract

Dahuofang Reservoir Water Diversion Tunnel Engineering is the longest tunnel engineering in the world at present. Three-quarter tunnel was constructed by TBM. Aiming at the fact of this engineering the simulation models of the tunnel construction using TBM were established which were based on the cyclic operation network simulation theory and the simulation software was developed. Eleven construction projects of the exit were simulated and found an optimal project finally by using the theory of fuzzy multiple attribute decision- making.

About this research paper

What this paper is about

Dahuofang Reservoir Water Diversion Tunnel Engineering is the longest tunnel engineering in the world at present. Three-quarter tunnel was constructed by TBM. Aiming at the fact of this engineering the simulation models of the tunnel construction using TBM were established which were based on the cyclic operation network simulation theory and the simulation software was developed. Eleven construction projects of the exit were simulated and found an optimal project finally by using the theory of fuzzy multiple attribute decision- making.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Dahuofang Reservoir Water Diversion Tunnel Engineering is the longest tunnel engineering in the world at present. Three-quarter tunnel was constructed by TBM. Aiming at the fact of this engineering the simulation models of the tunnel construction using TBM were established which were based on the cyclic operation network simulation theory and the simulation software was developed. Eleven construction projects of the exit were simulated and found an optimal project finally by using the theory of fuzzy multiple attribute decision- making.

Key concepts: Water diversion, Civil engineering, Tunnel construction, Engineering, Geotechnical engineering, Environmental science, Water resource management

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on Optimization Project of the Dahuofang Reservoir Water Diversion Tunnel Engineering Construction by TBM — Research Paper | ScholarLens