BLASTING DEMOLITION OF A 42M HIGH RAILWAY BRIDGE PIER
Liu Chang-bang
Abstract
Liu Chang-bang
Abstract
In this paper,a blasting project of demolishing a high railway bridge pier of 42m was introduced.In order to protect the abutment of the pier and the other structures nearby,some effective measures were taken based on the features of the pier structure and its surrounding,such as the proper blasting cut position,precisely orientated openings,the careful design and construction of the steel bars pre-cutting.The success of this project showed that the experience could be consulted by the engineering of the similar.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In this paper,a blasting project of demolishing a high railway bridge pier of 42m was introduced.In order to protect the abutment of the pier and the other structures nearby,some effective measures were taken based on the features of the pier structure and its surrounding,such as the proper blasting cut position,precisely orientated openings,the careful design and construction of the steel bars pre-cutting.The success of this project showed that the experience could be consulted by the engineering of the similar.
Key concepts: Pier, Engineering, Demolition, Rock blasting, Abutment, Bridge (graph theory), Structural engineering, Civil engineering