2005•BlastingRequires access

Demolition of Provisional Bridge Pier of Steel-tube Arch Bridge by Controlled Blasting

Zhiyang Chen

Open publisher page 0 citations

Abstract

The demolition method , selection of blasting parameters and defending measures in controlled blasting of provisional high-grade reinforced concrete bridge pier of steel-tube arch bridge are discussed. The experience and the technological parameters can be as references for the similar projects of controlled blasting.

About this research paper

What this paper is about

The demolition method , selection of blasting parameters and defending measures in controlled blasting of provisional high-grade reinforced concrete bridge pier of steel-tube arch bridge are discussed. The experience and the technological parameters can be as references for the similar projects of controlled blasting.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The demolition method , selection of blasting parameters and defending measures in controlled blasting of provisional high-grade reinforced concrete bridge pier of steel-tube arch bridge are discussed. The experience and the technological parameters can be as references for the similar projects of controlled blasting.

Key concepts: Pier, Demolition, Rock blasting, Bridge (graph theory), Engineering, Arch bridge, Arch, Structural engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Demolition of Provisional Bridge Pier of Steel-tube Arch Bridge by Controlled Blasting — Research Paper | ScholarLens