Construction Technology in Excavation of Diversion Tunnel at the Right Bank of Xiluodu Hydropower Station
Yan Li
Abstract
Yan Li
Abstract
There are 3 diversion tunnels respectively on both the left and the right bank of Xiluodu project,and the excavation technology for the upper layer of No.6 diversion tunnel is introduced in this paper.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
There are 3 diversion tunnels respectively on both the left and the right bank of Xiluodu project,and the excavation technology for the upper layer of No.6 diversion tunnel is introduced in this paper.
Key concepts: Excavation, Hydropower, Water diversion, Engineering, Geotechnical engineering, Mining engineering, Geology, Civil engineering