Construction Technology in Excavation of Diversion Tunnel at the Right Bank of Xiluodu Hydropower Station

Yan Li

Open publisher page 0 citations

Abstract

There are 3 diversion tunnels respectively on both the left and the right bank of Xiluodu project,and the excavation technology for the upper layer of No.6 diversion tunnel is introduced in this paper.

About this research paper

What this paper is about

There are 3 diversion tunnels respectively on both the left and the right bank of Xiluodu project,and the excavation technology for the upper layer of No.6 diversion tunnel is introduced in this paper.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

There are 3 diversion tunnels respectively on both the left and the right bank of Xiluodu project,and the excavation technology for the upper layer of No.6 diversion tunnel is introduced in this paper.

Key concepts: Excavation, Hydropower, Water diversion, Engineering, Geotechnical engineering, Mining engineering, Geology, Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction Technology in Excavation of Diversion Tunnel at the Right Bank of Xiluodu Hydropower Station — Research Paper | ScholarLens