Underground Chamber Group Shaft Structure Design of Diversion Tunnel for Xiluodu Hydropower Station

Zhang Ji

Open publisher page 0 citations

Abstract

The design conditions,design standard and shaft structure design of the underground chamber group of diversion tunnel for Xiluodu hydropower station introduced in the paper.After the practice test of five flood seasons,the diversion tunnel shaft gate withstood high water pressure test,reached the expected design effect,verified the rationality and feasibility of the design,provided the conditions for project schedule generation.

About this research paper

What this paper is about

The design conditions,design standard and shaft structure design of the underground chamber group of diversion tunnel for Xiluodu hydropower station introduced in the paper.After the practice test of five flood seasons,the diversion tunnel shaft gate withstood high water pressure test,reached the expected design effect,verified the rationality and feasibility of the design,provided the conditions for project schedule generation.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The design conditions,design standard and shaft structure design of the underground chamber group of diversion tunnel for Xiluodu hydropower station introduced in the paper.After the practice test of five flood seasons,the diversion tunnel shaft gate withstood high water pressure test,reached the expected design effect,verified the rationality and feasibility of the design,provided the conditions for project schedule generation.

Key concepts: Hydropower, Engineering, Excavation, Water diversion, Civil engineering, Schedule, Water pressure, Marine engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Underground Chamber Group Shaft Structure Design of Diversion Tunnel for Xiluodu Hydropower Station — Research Paper | ScholarLens