Underground Chamber Group Shaft Structure Design of Diversion Tunnel for Xiluodu Hydropower Station
Zhang Ji
Abstract
Zhang Ji
Abstract
The design conditions,design standard and shaft structure design of the underground chamber group of diversion tunnel for Xiluodu hydropower station introduced in the paper.After the practice test of five flood seasons,the diversion tunnel shaft gate withstood high water pressure test,reached the expected design effect,verified the rationality and feasibility of the design,provided the conditions for project schedule generation.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The design conditions,design standard and shaft structure design of the underground chamber group of diversion tunnel for Xiluodu hydropower station introduced in the paper.After the practice test of five flood seasons,the diversion tunnel shaft gate withstood high water pressure test,reached the expected design effect,verified the rationality and feasibility of the design,provided the conditions for project schedule generation.
Key concepts: Hydropower, Engineering, Excavation, Water diversion, Civil engineering, Schedule, Water pressure, Marine engineering