2008Journal of Sediment ResearchRequires access

Initial operation of Xiaolangdi Reservoir and responses of sedimentation in the Lower Yellow River

Jianguo Chen

Open publisher page 3 citations

Abstract

Based on the measured data,the sedimentation characteristics in Xiaolangdi Reservoir and responses of the lower Yellow River during the initial operation from 2000 to 2006 have been analyzed,including the effect of Xiaolangdi Reservoir operation on the flow and sediment condition entering the lower Yellow River,the erosion characteristics of the lower Yellow River,and the relation between reservoir sedimentation and downstream channel erosion.These characteristics are then compaired with those by Sanmenxia Reservoir during its initial operation from 1960 to 1964.Finally,some suggestions to Xiaolangdi Reservoir operation and flow-sediment regulation are proposed.

About this research paper

What this paper is about

Based on the measured data,the sedimentation characteristics in Xiaolangdi Reservoir and responses of the lower Yellow River during the initial operation from 2000 to 2006 have been analyzed,including the effect of Xiaolangdi Reservoir operation on the flow and sediment condition entering the lower Yellow River,the erosion characteristics of the lower Yellow River,and the relation between reservoir sedimentation and downstream channel erosion.These characteristics are then compaired with those by Sanmenxia Reservoir during its initial operation from 1960 to 1964.Finally,some suggestions to Xiaolangdi Reservoir operation and flow-sediment regulation are proposed.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Based on the measured data,the sedimentation characteristics in Xiaolangdi Reservoir and responses of the lower Yellow River during the initial operation from 2000 to 2006 have been analyzed,including the effect of Xiaolangdi Reservoir operation on the flow and sediment condition entering the lower Yellow River,the erosion characteristics of the lower Yellow River,and the relation between reservoir sedimentation and downstream channel erosion.These characteristics are then compaired with those by Sanmenxia Reservoir during its initial operation from 1960 to 1964.Finally,some suggestions to Xiaolangdi Reservoir operation and flow-sediment regulation are proposed.

Key concepts: Sedimentation, Erosion, Hydrology (agriculture), Sediment, Geology, Channel (broadcasting), Flow (mathematics), Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
Initial operation of Xiaolangdi Reservoir and responses of sedimentation in the Lower Yellow River — Research Paper | ScholarLens