2008Journal of Sediment ResearchRequires access

Study on preliminary operation of Xiaolangdi Reservoir and flow-sediment regulation of the Yellow River

Qiwei Han

Open publisher page 2 citations

Abstract

The study on some topics concerning reservoir sedimentation and flow-sediment regulation in the preliminary operation of Xiaolangdi Reservoir is presented in this paper.The quantitative expressions of trapping coarse particles and sluicing fine particles and their control conditions have been derived.The percentage of reservoir deposition and ratio of sediment sluiced from the lower reach are closely related and their relation has been demonstrated by both theory and field data.For a certain reservoir the relation is single-valued and it is reliable to connect the reservoir sedimentation and downstream erosion.The important effect of the flow-sediment regulation of Xiaolangdi Reservoir to the improvement of channel in the lower Yellow River has been analyzed.The expression of second channel-forming discharge and the relation between second channel-forming discharge and the ban-full discharge in the lower Yellow River have been discussed and then the possibility for increasing the channel-forming discharge at present and in the future is demonstrated.Finally it has been shown that it is necessary to change the practical operation mode from reservoir planning.

About this research paper

What this paper is about

The study on some topics concerning reservoir sedimentation and flow-sediment regulation in the preliminary operation of Xiaolangdi Reservoir is presented in this paper.The quantitative expressions of trapping coarse particles and sluicing fine particles and their control conditions have been derived.The percentage of reservoir deposition and ratio of sediment sluiced from the lower reach are closely related and their relation has been demonstrated by both theory and field data.For a certain reservoir the relation is single-valued and it is reliable to connect the reservoir sedimentation and downstream erosion.The important effect of the flow-sediment regulation of Xiaolangdi Reservoir to the improvement of channel in the lower Yellow River has been analyzed.The expression of second channel-forming discharge and the relation between second channel-forming discharge and the ban-full discharge in the lower Yellow River have been discussed and then the possibility for increasing the channel-forming discharge at present and in the future is demonstrated.Finally it has been shown that it is necessary to change the practical operation mode from reservoir planning.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The study on some topics concerning reservoir sedimentation and flow-sediment regulation in the preliminary operation of Xiaolangdi Reservoir is presented in this paper.The quantitative expressions of trapping coarse particles and sluicing fine particles and their control conditions have been derived.The percentage of reservoir deposition and ratio of sediment sluiced from the lower reach are closely related and their relation has been demonstrated by both theory and field data.For a certain reservoir the relation is single-valued and it is reliable to connect the reservoir sedimentation and downstream erosion.The important effect of the flow-sediment regulation of Xiaolangdi Reservoir to the improvement of channel in the lower Yellow River has been analyzed.The expression of second channel-forming discharge and the relation between second channel-forming discharge and the ban-full discharge in the lower Yellow River have been discussed and then the possibility for increasing the channel-forming discharge at present and in the future is demonstrated.Finally it has been shown that it is necessary to change the practical operation mode from reservoir planning.

Key concepts: Sedimentation, Sediment, Channel (broadcasting), Erosion, Deposition (geology), Hydrology (agriculture), Flow (mathematics), Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on preliminary operation of Xiaolangdi Reservoir and flow-sediment regulation of the Yellow River — Research Paper | ScholarLens