2012Shanxi ArchitectureRequires access

Study on the construction technology of short-distance shield tunnel under-crossing existing tunnel

Zhu Wen-min

Open publisher page 0 citations

Abstract

Under the condition of short-distance shield tunnel under-crossing existing tunnel without reinforcing existing internal tunnel and surroundings,using FLAC3D finite difference program,the paper simulates and calculates the subsidence deformation of surface and existing tunnel and the maximum stress between the two layers,optimizes the shield construction parameters according to numerical calculation.When the shield tunnel construction is within the influential domain of the existing tunnel,the automatic monitoring is set out for existing tunnel.According to the monitoring results,it further adjusts shield parameters,so as to make the shield tunnel fast crossing existing tunnel.As a result,it achieves great social and economic benefits.

About this research paper

What this paper is about

Under the condition of short-distance shield tunnel under-crossing existing tunnel without reinforcing existing internal tunnel and surroundings,using FLAC3D finite difference program,the paper simulates and calculates the subsidence deformation of surface and existing tunnel and the maximum stress between the two layers,optimizes the shield construction parameters according to numerical calculation.When the shield tunnel construction is within the influential domain of the existing tunnel,the automatic monitoring is set out for existing tunnel.According to the monitoring results,it further adjusts shield parameters,so as to make the shield tunnel fast crossing existing tunnel.As a result,it achieves great social and economic benefits.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Under the condition of short-distance shield tunnel under-crossing existing tunnel without reinforcing existing internal tunnel and surroundings,using FLAC3D finite difference program,the paper simulates and calculates the subsidence deformation of surface and existing tunnel and the maximum stress between the two layers,optimizes the shield construction parameters according to numerical calculation.When the shield tunnel construction is within the influential domain of the existing tunnel,the automatic monitoring is set out for existing tunnel.According to the monitoring results,it further adjusts shield parameters,so as to make the shield tunnel fast crossing existing tunnel.As a result,it achieves great social and economic benefits.

Key concepts: Shield, Tunnel construction, Water tunnel, Tunnel boring machine, Structural engineering, Engineering, Geotechnical engineering, Subsidence

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on the construction technology of short-distance shield tunnel under-crossing existing tunnel — Research Paper | ScholarLens