Study on the impacts of new shield tunnel construction on already-built concealed tunnels
MA Tian-we
Abstract
MA Tian-we
Abstract
Based on engineering case,applying ANSYS finite element software,it analyzes the possible impacts of new shield tunnel construction on already-built concealed tunnels.According to calculation results,it proposes reinforcing measures for existing tunnels.The testing results show that: during the shield crossing existing tunnel,the reinforcing system force in the existing tunnel is within the permitted scope.Thus,it guarantees the structural security of existing tunnel.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Based on engineering case,applying ANSYS finite element software,it analyzes the possible impacts of new shield tunnel construction on already-built concealed tunnels.According to calculation results,it proposes reinforcing measures for existing tunnels.The testing results show that: during the shield crossing existing tunnel,the reinforcing system force in the existing tunnel is within the permitted scope.Thus,it guarantees the structural security of existing tunnel.
Key concepts: Shield, Scope (computer science), Engineering, Tunnel construction, Civil engineering, Structural engineering, Forensic engineering, Construction engineering