Analysis of the Affect to the Existing Tunnel and Pipeline Under Shield Construction
Cars Shenzhen
Abstract
Cars Shenzhen
Abstract
Based on the construction of a shield tunnel near the existing tunnel and pipeline,the software of ANSYS was used to analyze the ground stratum squatting and the deformation and forces of the existing tunnel and pipeline under the construction process of shield tunnel.The result shows that the stress redistribution caused the maximum ground stratum offset the left side during the construction process of shield tunnel;the existing tunnel and pipeline easily caused stress concentration in the corner site,and the existing tunnel have the trend of tilt displacement to the shield tunnel clearance.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Based on the construction of a shield tunnel near the existing tunnel and pipeline,the software of ANSYS was used to analyze the ground stratum squatting and the deformation and forces of the existing tunnel and pipeline under the construction process of shield tunnel.The result shows that the stress redistribution caused the maximum ground stratum offset the left side during the construction process of shield tunnel;the existing tunnel and pipeline easily caused stress concentration in the corner site,and the existing tunnel have the trend of tilt displacement to the shield tunnel clearance.
Key concepts: Shield, Tunnel construction, Geotechnical engineering, Engineering, Structural engineering, Displacement (psychology), Geology, Psychology