Analysis of the Affect to the Existing Tunnel and Pipeline Under Shield Construction

Cars Shenzhen

Open publisher page 0 citations

Abstract

Based on the construction of a shield tunnel near the existing tunnel and pipeline,the software of ANSYS was used to analyze the ground stratum squatting and the deformation and forces of the existing tunnel and pipeline under the construction process of shield tunnel.The result shows that the stress redistribution caused the maximum ground stratum offset the left side during the construction process of shield tunnel;the existing tunnel and pipeline easily caused stress concentration in the corner site,and the existing tunnel have the trend of tilt displacement to the shield tunnel clearance.

About this research paper

What this paper is about

Based on the construction of a shield tunnel near the existing tunnel and pipeline,the software of ANSYS was used to analyze the ground stratum squatting and the deformation and forces of the existing tunnel and pipeline under the construction process of shield tunnel.The result shows that the stress redistribution caused the maximum ground stratum offset the left side during the construction process of shield tunnel;the existing tunnel and pipeline easily caused stress concentration in the corner site,and the existing tunnel have the trend of tilt displacement to the shield tunnel clearance.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Based on the construction of a shield tunnel near the existing tunnel and pipeline,the software of ANSYS was used to analyze the ground stratum squatting and the deformation and forces of the existing tunnel and pipeline under the construction process of shield tunnel.The result shows that the stress redistribution caused the maximum ground stratum offset the left side during the construction process of shield tunnel;the existing tunnel and pipeline easily caused stress concentration in the corner site,and the existing tunnel have the trend of tilt displacement to the shield tunnel clearance.

Key concepts: Shield, Tunnel construction, Geotechnical engineering, Engineering, Structural engineering, Displacement (psychology), Geology, Psychology

Related papers

Back to paper searchBrowse research topicsOriginal source
Analysis of the Affect to the Existing Tunnel and Pipeline Under Shield Construction — Research Paper | ScholarLens