Test on Channel lnlet of Wujiajie Hydro-junction Project of Fujiang River
Miao Ji
Abstract
Miao Ji
Abstract
Wujiajie Hydro junction is a cut-bend Project.From the normal scale physical mode test,navigable flow conditions of inlet of the approach channel is analyzed under various operational plans.From the sudy,it'shown that the problems of navigation and electricity supply can be solved,when the layout and the reservoir maneuver scheme is optimized.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Wujiajie Hydro junction is a cut-bend Project.From the normal scale physical mode test,navigable flow conditions of inlet of the approach channel is analyzed under various operational plans.From the sudy,it'shown that the problems of navigation and electricity supply can be solved,when the layout and the reservoir maneuver scheme is optimized.
Key concepts: Channel (broadcasting), Inlet, Mode (computer interface), Flow (mathematics), Marine engineering, Scheme (mathematics), Environmental science, Test (biology)