2014•Hydro-Science and EngineeringRequires access

Optimal experiments of layout of an approach channel for Sanxikou navigable power project

LI Yan-f

Open publisher page 0 citations

Abstract

Sanxikou navigable power project is located at the river junction of two river bends. The flow pattern along the entrance area of the upper approach channel is disturbed by the dynamic water in the reservoir near the curved or braided reaches,and the river bend and the inflow of a small tributary disturb the flow pattern in the entrance area of the lower approach channel. In this study,the navigable flow conditions in the approach channel and its entrance area have been analyzed through the hydraulic model tests. Based on the contrastive analysis of experiment results,suggestions for the flood release of the navigable power project for safe navigation are made.Reasonably dredging the convex bank along the channel and regulating the length and angle of the approach channel can effectively improve the navigable flow conditions at the entrance area of the lower approach channel of Sanxikou navigable power project. The optimized management and measures to improve the shipping problems of the lower approach channel are given. These research results have important reference values for the similar projects in the future.

About this research paper

What this paper is about

Sanxikou navigable power project is located at the river junction of two river bends. The flow pattern along the entrance area of the upper approach channel is disturbed by the dynamic water in the reservoir near the curved or braided reaches,and the river bend and the inflow of a small tributary disturb the flow pattern in the entrance area of the lower approach channel. In this study,the navigable flow conditions in the approach channel and its entrance area have been analyzed through the hydraulic model tests. Based on the contrastive analysis of experiment results,suggestions for the flood release of the navigable power project for safe navigation are made.Reasonably dredging the convex bank along the channel and regulating the length and angle of the approach channel can effectively improve the navigable flow conditions at the entrance area of the lower approach channel of Sanxikou navigable power project. The optimized management and measures to improve the shipping problems of the lower approach channel are given. These research results have important reference values for the similar projects in the future.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Sanxikou navigable power project is located at the river junction of two river bends. The flow pattern along the entrance area of the upper approach channel is disturbed by the dynamic water in the reservoir near the curved or braided reaches,and the river bend and the inflow of a small tributary disturb the flow pattern in the entrance area of the lower approach channel. In this study,the navigable flow conditions in the approach channel and its entrance area have been analyzed through the hydraulic model tests. Based on the contrastive analysis of experiment results,suggestions for the flood release of the navigable power project for safe navigation are made.Reasonably dredging the convex bank along the channel and regulating the length and angle of the approach channel can effectively improve the navigable flow conditions at the entrance area of the lower approach channel of Sanxikou navigable power project. The optimized management and measures to improve the shipping problems of the lower approach channel are given. These research results have important reference values for the similar projects in the future.

Key concepts: Dredging, Channel (broadcasting), Tributary, Flow (mathematics), Hydrology (agriculture), Stream power, Inflow, Channelized

Related papers

Back to paper searchBrowse research topicsOriginal source
Optimal experiments of layout of an approach channel for Sanxikou navigable power project — Research Paper | ScholarLens