Analysis of Initial Traffic Volume of Wuhan-Guangzhou Passenger Dedicated Line
Ren Min
Abstract
Ren Min
Abstract
Research purposes:The initial traffic volume composition of the Wuhan-Guangzhou Passenger Dedicated Line is analyzed and its operational efficiency is evaluated for the purpose of knowing the initial traffic volume and its composition of passenger dedicated line to urge the operator doing the better works of the transportation organization,transportation coordination and marketing. Research conclusions:The result shows the initial traffic volume composition of the Wuhan-Guangzhou Passenger Dedicated Line possesses the characteristics that the induced traffic volume is bigger than the lost traffic volume in the north areas to Yueyang while the lost traffic volume is bigger than the induced traffic volume in south areas to Yueyang.Though the occupancy rate of train is from 36.37% to 80.01% in the different areas,but the completed local railway passenger traffic volume and the utilization rate are low.It is proposed that in this case,the government should regard the high-speed railway as the public welfare undertaking and give the appropriate subsidy to the railway to assist the operator reducing the price of train ticket for enhancing the occupancy rate and giving the play to the high-speed railway,so that the ordinary people can afford and enjoy the efficient travel services of the high-speed railway.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Research purposes:The initial traffic volume composition of the Wuhan-Guangzhou Passenger Dedicated Line is analyzed and its operational efficiency is evaluated for the purpose of knowing the initial traffic volume and its composition of passenger dedicated line to urge the operator doing the better works of the transportation organization,transportation coordination and marketing. Research conclusions:The result shows the initial traffic volume composition of the Wuhan-Guangzhou Passenger Dedicated Line possesses the characteristics that the induced traffic volume is bigger than the lost traffic volume in the north areas to Yueyang while the lost traffic volume is bigger than the induced traffic volume in south areas to Yueyang.Though the occupancy rate of train is from 36.37% to 80.01% in the different areas,but the completed local railway passenger traffic volume and the utilization rate are low.It is proposed that in this case,the government should regard the high-speed railway as the public welfare undertaking and give the appropriate subsidy to the railway to assist the operator reducing the price of train ticket for enhancing the occupancy rate and giving the play to the high-speed railway,so that the ordinary people can afford and enjoy the efficient travel services of the high-speed railway.
Key concepts: Traffic volume, Transport engineering, Volume (thermodynamics), Ticket, Subsidy, Heavy traffic, Occupancy, Line (geometry)