Discussion of Error Estimating Plan in Second-Phase Project of Tongkuangyu Copper Mine
Zts Non-ferrous
Abstract
Zts Non-ferrous
Abstract
Multiple factors resulted in end-point error are discovered by analizing the causes for the wire end-point error.It is proposed firstly that the revolutionaxis equation can be used for conputation of end-point error in assigned tunnel direction.Based on actual conditions of second-phase project,a suggestion for error estimation and survey plan has been put forward.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Multiple factors resulted in end-point error are discovered by analizing the causes for the wire end-point error.It is proposed firstly that the revolutionaxis equation can be used for conputation of end-point error in assigned tunnel direction.Based on actual conditions of second-phase project,a suggestion for error estimation and survey plan has been put forward.
Key concepts: Plan (archaeology), Point (geometry), Estimation, Phase (matter), Copper mine, Approximation error, Computer science, Mathematics