2007•Nonferrous MetalsRequires access

Discussion of Error Estimating Plan in Second-Phase Project of Tongkuangyu Copper Mine

Zts Non-ferrous

Open publisher page 0 citations

Abstract

Multiple factors resulted in end-point error are discovered by analizing the causes for the wire end-point error.It is proposed firstly that the revolutionaxis equation can be used for conputation of end-point error in assigned tunnel direction.Based on actual conditions of second-phase project,a suggestion for error estimation and survey plan has been put forward.

About this research paper

What this paper is about

Multiple factors resulted in end-point error are discovered by analizing the causes for the wire end-point error.It is proposed firstly that the revolutionaxis equation can be used for conputation of end-point error in assigned tunnel direction.Based on actual conditions of second-phase project,a suggestion for error estimation and survey plan has been put forward.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Multiple factors resulted in end-point error are discovered by analizing the causes for the wire end-point error.It is proposed firstly that the revolutionaxis equation can be used for conputation of end-point error in assigned tunnel direction.Based on actual conditions of second-phase project,a suggestion for error estimation and survey plan has been put forward.

Key concepts: Plan (archaeology), Point (geometry), Estimation, Phase (matter), Copper mine, Approximation error, Computer science, Mathematics

Related papers

Back to paper searchBrowse research topicsOriginal source
Discussion of Error Estimating Plan in Second-Phase Project of Tongkuangyu Copper Mine — Research Paper | ScholarLens