Study on Treatment Method of Lateral Through Error in Underground Project Survey

Yonghui Hou

Open publisher page 0 citations

Abstract

In order to improve the through construction quality of the underground project and to reduce the lateral through error occurred by the error of the surface control network,base on the study on the average error method of the surface control network for the underground project and the error estimation method of the lateral through,in references of the average error model of the tunnel surface plane control network with the through constraint conditions,the paper had a study on the average error method on the surface control network under the conventional min 2 multiplying principle and with the lateral through error as zero constraint conditions.The method was applied to calculate the case.Some proposals were provided for the average error method.The paper would have certain guidance to the average error of the through in the similar underground projects.

About this research paper

What this paper is about

In order to improve the through construction quality of the underground project and to reduce the lateral through error occurred by the error of the surface control network,base on the study on the average error method of the surface control network for the underground project and the error estimation method of the lateral through,in references of the average error model of the tunnel surface plane control network with the through constraint conditions,the paper had a study on the average error method on the surface control network under the conventional min 2 multiplying principle and with the lateral through error as zero constraint conditions.The method was applied to calculate the case.Some proposals were provided for the average error method.The paper would have certain guidance to the average error of the through in the similar underground projects.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to improve the through construction quality of the underground project and to reduce the lateral through error occurred by the error of the surface control network,base on the study on the average error method of the surface control network for the underground project and the error estimation method of the lateral through,in references of the average error model of the tunnel surface plane control network with the through constraint conditions,the paper had a study on the average error method on the surface control network under the conventional min 2 multiplying principle and with the lateral through error as zero constraint conditions.The method was applied to calculate the case.Some proposals were provided for the average error method.The paper would have certain guidance to the average error of the through in the similar underground projects.

Key concepts: Constraint (computer-aided design), Surface (topology), Control network, Error detection and correction, Plane (geometry), Control (management), Quality (philosophy), Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on Treatment Method of Lateral Through Error in Underground Project Survey — Research Paper | ScholarLens