2010•Unpublished venueRequires access

Precision Analysis and Survey Scheme Design of Tunnel Engineering

Sun Hai-yan

Open publisher page 0 citations

Abstract

The breakthrough error is one of the most important parameters which indicate whether the tunnel has been constructed favorably according to the specification.It is crucial to distribute the breakthrough error allowance and scheme out a survey precision design appropriately.This paper studies the survey precision and the influence value of the lateral breakthrough error in each portion of the tunnel project,providing a serial of theoretical reference tables for different tunnel project according to numerical calculation.

About this research paper

What this paper is about

The breakthrough error is one of the most important parameters which indicate whether the tunnel has been constructed favorably according to the specification.It is crucial to distribute the breakthrough error allowance and scheme out a survey precision design appropriately.This paper studies the survey precision and the influence value of the lateral breakthrough error in each portion of the tunnel project,providing a serial of theoretical reference tables for different tunnel project according to numerical calculation.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The breakthrough error is one of the most important parameters which indicate whether the tunnel has been constructed favorably according to the specification.It is crucial to distribute the breakthrough error allowance and scheme out a survey precision design appropriately.This paper studies the survey precision and the influence value of the lateral breakthrough error in each portion of the tunnel project,providing a serial of theoretical reference tables for different tunnel project according to numerical calculation.

Key concepts: Allowance (engineering), Scheme (mathematics), Computer science, Survey research, Error analysis, Algorithm, Engineering, Mathematics

Related papers

Back to paper searchBrowse research topicsOriginal source
Precision Analysis and Survey Scheme Design of Tunnel Engineering — Research Paper | ScholarLens