Precision Analysis and Survey Scheme Design of Tunnel Engineering
Sun Hai-yan
Abstract
Sun Hai-yan
Abstract
The breakthrough error is one of the most important parameters which indicate whether the tunnel has been constructed favorably according to the specification.It is crucial to distribute the breakthrough error allowance and scheme out a survey precision design appropriately.This paper studies the survey precision and the influence value of the lateral breakthrough error in each portion of the tunnel project,providing a serial of theoretical reference tables for different tunnel project according to numerical calculation.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The breakthrough error is one of the most important parameters which indicate whether the tunnel has been constructed favorably according to the specification.It is crucial to distribute the breakthrough error allowance and scheme out a survey precision design appropriately.This paper studies the survey precision and the influence value of the lateral breakthrough error in each portion of the tunnel project,providing a serial of theoretical reference tables for different tunnel project according to numerical calculation.
Key concepts: Allowance (engineering), Scheme (mathematics), Computer science, Survey research, Error analysis, Algorithm, Engineering, Mathematics