Analysis of consolidation settlements caused by shield tunneling

Yitong Zhang

Open publisher page 1 citations

Abstract

Following a tunnel excavation in low-permeability soil,it is commonly observed that the ground surface continues to settle with time,as the dissipation of the excess pore pressure leads to the consolidation settlements.For studying the consolidation settlement of soil caused by shield tunneling,an initial excess pore water pressure formula during the tunnel construction is presented based on Henkel pore water pressure theory;and it can be used to calculate the consolidation settlement by means of numerical analysis.This approach has been applied to the engineering case of the Shanghai metro tunnel-line 2;and the calculation results are obtained based on the soil geological condition.As shown in the analytical calculation,the maximum value of the initial excess pore water pressure is located at the spring-line of the tunnel.The calculation results of the consolidation settlements are in good agreement with the field data.

About this research paper

What this paper is about

Following a tunnel excavation in low-permeability soil,it is commonly observed that the ground surface continues to settle with time,as the dissipation of the excess pore pressure leads to the consolidation settlements.For studying the consolidation settlement of soil caused by shield tunneling,an initial excess pore water pressure formula during the tunnel construction is presented based on Henkel pore water pressure theory;and it can be used to calculate the consolidation settlement by means of numerical analysis.This approach has been applied to the engineering case of the Shanghai metro tunnel-line 2;and the calculation results are obtained based on the soil geological condition.As shown in the analytical calculation,the maximum value of the initial excess pore water pressure is located at the spring-line of the tunnel.The calculation results of the consolidation settlements are in good agreement with the field data.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Following a tunnel excavation in low-permeability soil,it is commonly observed that the ground surface continues to settle with time,as the dissipation of the excess pore pressure leads to the consolidation settlements.For studying the consolidation settlement of soil caused by shield tunneling,an initial excess pore water pressure formula during the tunnel construction is presented based on Henkel pore water pressure theory;and it can be used to calculate the consolidation settlement by means of numerical analysis.This approach has been applied to the engineering case of the Shanghai metro tunnel-line 2;and the calculation results are obtained based on the soil geological condition.As shown in the analytical calculation,the maximum value of the initial excess pore water pressure is located at the spring-line of the tunnel.The calculation results of the consolidation settlements are in good agreement with the field data.

Key concepts: Consolidation (business), Pore water pressure, Geotechnical engineering, Shield, Human settlement, Geology, Excavation, Permeability (electromagnetism)

Related papers

Back to paper searchBrowse research topicsOriginal source
Analysis of consolidation settlements caused by shield tunneling — Research Paper | ScholarLens