Research on calculation of post-construction transverse surface settlement caused by shield tunneling

Yang Ze-fe

Open publisher page 0 citations

Abstract

Due to the excess pore water pressure dissipation,the post-construction surface settlement will be continued caused by shield tunneling.Based on past research,a calculation method of initial excess pore water pressure around the tunnel is put forward.By using layerwise summation method,the surface consolidation settlement can be got within disturbed region of excess pore water pressure dissipation.Combining with the surface settlement in tunnel construction phase,total transverse post-construction surface settlement is obtained.The total surface settlement after soil consolidation is proposed;and surface settlement rate changes over time are also studied.As is shown in analytical calculation,the calculated results of the transverse surface settlement curves are in good agreement with the field data;and they are also in accordance with the normal distribution law.The development of total surface settlement rate is in good agreement with the field data.

About this research paper

What this paper is about

Due to the excess pore water pressure dissipation,the post-construction surface settlement will be continued caused by shield tunneling.Based on past research,a calculation method of initial excess pore water pressure around the tunnel is put forward.By using layerwise summation method,the surface consolidation settlement can be got within disturbed region of excess pore water pressure dissipation.Combining with the surface settlement in tunnel construction phase,total transverse post-construction surface settlement is obtained.The total surface settlement after soil consolidation is proposed;and surface settlement rate changes over time are also studied.As is shown in analytical calculation,the calculated results of the transverse surface settlement curves are in good agreement with the field data;and they are also in accordance with the normal distribution law.The development of total surface settlement rate is in good agreement with the field data.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Due to the excess pore water pressure dissipation,the post-construction surface settlement will be continued caused by shield tunneling.Based on past research,a calculation method of initial excess pore water pressure around the tunnel is put forward.By using layerwise summation method,the surface consolidation settlement can be got within disturbed region of excess pore water pressure dissipation.Combining with the surface settlement in tunnel construction phase,total transverse post-construction surface settlement is obtained.The total surface settlement after soil consolidation is proposed;and surface settlement rate changes over time are also studied.As is shown in analytical calculation,the calculated results of the transverse surface settlement curves are in good agreement with the field data;and they are also in accordance with the normal distribution law.The development of total surface settlement rate is in good agreement with the field data.

Key concepts: Consolidation (business), Shield, Geotechnical engineering, Pore water pressure, Settlement (finance), Dissipation, Transverse plane, Quantum tunnelling

Related papers

Back to paper searchBrowse research topicsOriginal source
Research on calculation of post-construction transverse surface settlement caused by shield tunneling — Research Paper | ScholarLens