RESEARCH ON POST-CONSTRUCTION SURFACE SETTLEMENT CAUSED BY SHIELD TUNNELING

Xinjiang Wei

Open publisher page 1 citations

Abstract

Excess pore pressure and post-construction consolidation settlement of soil above tunnel axis caused by shield tunneling were studied.A calculation method for stress release rate caused by shield tunneling was put forward.Based on the Henkel pore water pressure theory,the excess pore water pressure of soil adjacent to the tunnel lining was deduced.Supposing that the points around the lining have the same stress release rate,the calculating method for excess pore water pressure of soil at tunnel arch crown was obtained.Using the theory of stress transfer,the distribution mode of excess pore water pressure above the tunnel axis was proposed.Assuming that the thickness of compressed soil equals that of the soil above tunnel,the theoretical calculation formula for consolidation settlement of ground above the tunnel axis was suggested based on Terzaghi?s one-dimensional consolidation theory.The results of case study show that the calculated results are in good agreement with the measured data.

About this research paper

What this paper is about

Excess pore pressure and post-construction consolidation settlement of soil above tunnel axis caused by shield tunneling were studied.A calculation method for stress release rate caused by shield tunneling was put forward.Based on the Henkel pore water pressure theory,the excess pore water pressure of soil adjacent to the tunnel lining was deduced.Supposing that the points around the lining have the same stress release rate,the calculating method for excess pore water pressure of soil at tunnel arch crown was obtained.Using the theory of stress transfer,the distribution mode of excess pore water pressure above the tunnel axis was proposed.Assuming that the thickness of compressed soil equals that of the soil above tunnel,the theoretical calculation formula for consolidation settlement of ground above the tunnel axis was suggested based on Terzaghi?s one-dimensional consolidation theory.The results of case study show that the calculated results are in good agreement with the measured data.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Excess pore pressure and post-construction consolidation settlement of soil above tunnel axis caused by shield tunneling were studied.A calculation method for stress release rate caused by shield tunneling was put forward.Based on the Henkel pore water pressure theory,the excess pore water pressure of soil adjacent to the tunnel lining was deduced.Supposing that the points around the lining have the same stress release rate,the calculating method for excess pore water pressure of soil at tunnel arch crown was obtained.Using the theory of stress transfer,the distribution mode of excess pore water pressure above the tunnel axis was proposed.Assuming that the thickness of compressed soil equals that of the soil above tunnel,the theoretical calculation formula for consolidation settlement of ground above the tunnel axis was suggested based on Terzaghi?s one-dimensional consolidation theory.The results of case study show that the calculated results are in good agreement with the measured data.

Key concepts: Terzaghi's principle, Pore water pressure, Consolidation (business), Geotechnical engineering, Shield, Lateral earth pressure, Quantum tunnelling, Settlement (finance)