Design of Water-stop in Joint of Hongjiadu Face Rockfill Dam
Lo Guang
Abstract
Lo Guang
Abstract
Hongjiadu face rockfill dam with a height of 179.5 m located at a karst gorge, which left bank is high and precipitous, and the topography of left and right banks is asymmetrical. According to those features, in design of water stop in joint of the dam, its original design was optimized, used the experience and newest achievements of constructing face rockfill dam in home and abroad for reference. As well as combining the model test of water stop structure of peripheral joint surface and design research of water stop structure, the paper raises some measures for improving the design.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Hongjiadu face rockfill dam with a height of 179.5 m located at a karst gorge, which left bank is high and precipitous, and the topography of left and right banks is asymmetrical. According to those features, in design of water stop in joint of the dam, its original design was optimized, used the experience and newest achievements of constructing face rockfill dam in home and abroad for reference. As well as combining the model test of water stop structure of peripheral joint surface and design research of water stop structure, the paper raises some measures for improving the design.
Key concepts: Joint (building), Karst, Geotechnical engineering, Face (sociological concept), Water pressure, Geology, Engineering, Civil engineering