Design Optimum of Concrete Face Rockfill Dam of Hongjiadu Hydropower Station

Ning Hua-wan

Open publisher page 0 citations

Abstract

The concrete face rockfill dam of Hongjiadu Hydropower Station located in deep mountain gorge of karst district, its left bank is high bluff side. Has used the newest achievements and experience of both abroad and home in construction CFRD for reference, the dam had be comprehensively optimized in the design for inviting tender. The paper expounds these optimum items such as its layout, division of dam body, top structure of dam, structure of peripheral joint, layout of plinth, high steep side, quarry and process of sending material go to the dam, etc.

About this research paper

What this paper is about

The concrete face rockfill dam of Hongjiadu Hydropower Station located in deep mountain gorge of karst district, its left bank is high bluff side. Has used the newest achievements and experience of both abroad and home in construction CFRD for reference, the dam had be comprehensively optimized in the design for inviting tender. The paper expounds these optimum items such as its layout, division of dam body, top structure of dam, structure of peripheral joint, layout of plinth, high steep side, quarry and process of sending material go to the dam, etc.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The concrete face rockfill dam of Hongjiadu Hydropower Station located in deep mountain gorge of karst district, its left bank is high bluff side. Has used the newest achievements and experience of both abroad and home in construction CFRD for reference, the dam had be comprehensively optimized in the design for inviting tender. The paper expounds these optimum items such as its layout, division of dam body, top structure of dam, structure of peripheral joint, layout of plinth, high steep side, quarry and process of sending material go to the dam, etc.

Key concepts: Hydropower, Karst, Joint (building), Bluff, Hydraulic structure, Engineering, Civil engineering, Excavation