Application of geo-mechanics in the discharge tunnel project of hydropower station
Yu Miao
Abstract
Yu Miao
Abstract
The geological condition under the elevation of 1981m on the inlet slope of the discharge tunnel at the left bank of Gongboxia hydropower Station is complex with interlaced faultages. The treatment of the tunnels face slope and the anchor of collapse on the left slope have own peculiarities, at the same time the formation of tunnel inlet and the excavation and anchor of transition section are typical. Especially the analysis of geological structure and its stability have particular features, which ensure not only the slope stability and the safety of tunnel formation, but also the construction schedule. The analysis of rock structure and geological structure provide reference for similar projects.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The geological condition under the elevation of 1981m on the inlet slope of the discharge tunnel at the left bank of Gongboxia hydropower Station is complex with interlaced faultages. The treatment of the tunnels face slope and the anchor of collapse on the left slope have own peculiarities, at the same time the formation of tunnel inlet and the excavation and anchor of transition section are typical. Especially the analysis of geological structure and its stability have particular features, which ensure not only the slope stability and the safety of tunnel formation, but also the construction schedule. The analysis of rock structure and geological structure provide reference for similar projects.
Key concepts: Excavation, Hydropower, Geotechnical engineering, Inlet, Geology, Section (typography), Tunnel construction, Engineering