DEMOLITION OF A LONGITUDINAL CONCRETE COFFER DAM IN DAYUANDU HYDROPOWER STATION BY CONTROLLED BLASTING

Zhou Ming

Open publisher page 0 citations

Abstract

In Dayuandu Hydropower Station, a longitudinal concrete cofferdam in complicated environment was successfully demolished by combination of short holes with long holes and use of millisecond blasting. Some experiences gained in this demolition blasting were introduced in this paper.

About this research paper

What this paper is about

In Dayuandu Hydropower Station, a longitudinal concrete cofferdam in complicated environment was successfully demolished by combination of short holes with long holes and use of millisecond blasting. Some experiences gained in this demolition blasting were introduced in this paper.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In Dayuandu Hydropower Station, a longitudinal concrete cofferdam in complicated environment was successfully demolished by combination of short holes with long holes and use of millisecond blasting. Some experiences gained in this demolition blasting were introduced in this paper.

Key concepts: Demolition, Cofferdam, Rock blasting, Hydropower, Engineering, Civil engineering, Geotechnical engineering, Electrical engineering