Quality Control in Implementation of Controlled Blasting in Dayuandu Concrete Cofferdam
Quan Zong-gou
Abstract
Quan Zong-gou
Abstract
The control blasting demolition of concrete longitudinal cofferdam with Dayuandu hydropower house is introduced,and quality control measures and ways which adopted in the course of constructon are analyzed.The concrete K,α value and pier resonance in the explosion are monitored, it provides useful practical information and theory guiding for similar project.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The control blasting demolition of concrete longitudinal cofferdam with Dayuandu hydropower house is introduced,and quality control measures and ways which adopted in the course of constructon are analyzed.The concrete K,α value and pier resonance in the explosion are monitored, it provides useful practical information and theory guiding for similar project.
Key concepts: Cofferdam, Demolition, Hydropower, Pier, Rock blasting, Engineering, Civil engineering, Geotechnical engineering