On Controlled Blasting Technique in the Second Gradient Dam of Huaguangtan Hydropower Station

Mei Han

Open publisher page 0 citations

Abstract

The first phase concrete cofferdams and the left bank dam foundation excavation of the second gradient dam of the Huaguangtan Hydropower Station is very close to the right bank dam block No.3 by 15m to 2.0 m,where the concrete has been poured few days ago.The essy illustrates the feasible construction procedure and blasting parameters according to the testing result on spot,which is on the reference of the other similar construction experience in China.The success of the controlled blasting technique used in this project can make some use for reference to other similar projects or conditions.

About this research paper

What this paper is about

The first phase concrete cofferdams and the left bank dam foundation excavation of the second gradient dam of the Huaguangtan Hydropower Station is very close to the right bank dam block No.3 by 15m to 2.0 m,where the concrete has been poured few days ago.The essy illustrates the feasible construction procedure and blasting parameters according to the testing result on spot,which is on the reference of the other similar construction experience in China.The success of the controlled blasting technique used in this project can make some use for reference to other similar projects or conditions.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The first phase concrete cofferdams and the left bank dam foundation excavation of the second gradient dam of the Huaguangtan Hydropower Station is very close to the right bank dam block No.3 by 15m to 2.0 m,where the concrete has been poured few days ago.The essy illustrates the feasible construction procedure and blasting parameters according to the testing result on spot,which is on the reference of the other similar construction experience in China.The success of the controlled blasting technique used in this project can make some use for reference to other similar projects or conditions.

Key concepts: Cofferdam, Hydropower, Foundation (evidence), Rock blasting, Geotechnical engineering, Excavation, Engineering, Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
On Controlled Blasting Technique in the Second Gradient Dam of Huaguangtan Hydropower Station — Research Paper | ScholarLens