The stone materials for the right-bank rock-fill dam of Guanyinyan hydropower station mostly comes from the excavation debris of right dam foundation or other parts,so the technical feature of this excavation is to both fulfill the excavation requirement and control the quality of rock-fill material.On analyzing the conditions of dam bedrock,six groups of field blasting trial with different blast parameters were carried out,and the characters of excavation slag lumpiness and gradation were analyzed to optimize excavation scheme of dam foundation,drilling-blasting parameters and construction technology.

About this research paper

What this paper is about

The stone materials for the right-bank rock-fill dam of Guanyinyan hydropower station mostly comes from the excavation debris of right dam foundation or other parts,so the technical feature of this excavation is to both fulfill the excavation requirement and control the quality of rock-fill material.On analyzing the conditions of dam bedrock,six groups of field blasting trial with different blast parameters were carried out,and the characters of excavation slag lumpiness and gradation were analyzed to optimize excavation scheme of dam foundation,drilling-blasting parameters and construction technology.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The stone materials for the right-bank rock-fill dam of Guanyinyan hydropower station mostly comes from the excavation debris of right dam foundation or other parts,so the technical feature of this excavation is to both fulfill the excavation requirement and control the quality of rock-fill material.On analyzing the conditions of dam bedrock,six groups of field blasting trial with different blast parameters were carried out,and the characters of excavation slag lumpiness and gradation were analyzed to optimize excavation scheme of dam foundation,drilling-blasting parameters and construction technology.

Key concepts: Excavation, Foundation (evidence), Geotechnical engineering, Drilling and blasting, Mining engineering, Gradation, Drilling, Bedrock

Related papers

Back to paper searchBrowse research topicsOriginal source
Blasting Trial and Analysis of Stone Quarrying for Rock-fill Dam in Guanyinyan Hydropower Station — Research Paper | ScholarLens