CRACK GENSIS AND ITS PREVENTION MEASURES OF DIKE ENGINEERING IN SHANDONG DONGMING SECTION OF THE YELLOW RIVER
Bian Yi-fei
Abstract
Bian Yi-fei
Abstract
Dike engineering building of the lower Yellow river provided reliable guarantee for flood control safety,but on account of many causes,crack appeared already in many parts of shandong dongming dike engineering of the yellow river.Crack would affect safety of the dike engineering.The paper analyzed the crack genesis,and brought forward prevention measures.It would provided technique sustaining for dike engineering building of the Yellow river.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Dike engineering building of the lower Yellow river provided reliable guarantee for flood control safety,but on account of many causes,crack appeared already in many parts of shandong dongming dike engineering of the yellow river.Crack would affect safety of the dike engineering.The paper analyzed the crack genesis,and brought forward prevention measures.It would provided technique sustaining for dike engineering building of the Yellow river.
Key concepts: Dike, Flood control, Section (typography), Flood myth, Geology, Flood prevention, Geotechnical engineering, Civil engineering