2005West-china Exploration EngineeringRequires access

Engineering Geological Investigation of Yangtze River Dike

Xiao Wu

Open publisher page 0 citations

Abstract

The dike on the middle and lower reaches of Yangtze River is about 3600 kilometers. Owing to a long history of its formation, the complicated filling of dike body, the irregular density of compression, the uncompacted junction of the dike and foundation, as well as the complex geological structures of dike ground, the dangerous circumstances on the dike body, dike foundation and bank happen frequently in flood seasons every year accordingly, which exceedingly threaten the safety of people's lives and properties. In this article, the main engineering geological problems are concluded, some thoughts and methods in engineering geological investigation are put forward, and the classification of engineering geology of dike foundation is discussed, at last some cognitions about several issues in dike engineering of Yangtze River are stated.

About this research paper

What this paper is about

The dike on the middle and lower reaches of Yangtze River is about 3600 kilometers. Owing to a long history of its formation, the complicated filling of dike body, the irregular density of compression, the uncompacted junction of the dike and foundation, as well as the complex geological structures of dike ground, the dangerous circumstances on the dike body, dike foundation and bank happen frequently in flood seasons every year accordingly, which exceedingly threaten the safety of people's lives and properties. In this article, the main engineering geological problems are concluded, some thoughts and methods in engineering geological investigation are put forward, and the classification of engineering geology of dike foundation is discussed, at last some cognitions about several issues in dike engineering of Yangtze River are stated.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The dike on the middle and lower reaches of Yangtze River is about 3600 kilometers. Owing to a long history of its formation, the complicated filling of dike body, the irregular density of compression, the uncompacted junction of the dike and foundation, as well as the complex geological structures of dike ground, the dangerous circumstances on the dike body, dike foundation and bank happen frequently in flood seasons every year accordingly, which exceedingly threaten the safety of people's lives and properties. In this article, the main engineering geological problems are concluded, some thoughts and methods in engineering geological investigation are put forward, and the classification of engineering geology of dike foundation is discussed, at last some cognitions about several issues in dike engineering of Yangtze River are stated.

Key concepts: Dike, Yangtze river, Foundation (evidence), Geology, Flood myth, Engineering geology, Geotechnical engineering, Archaeology

Related papers

Back to paper searchBrowse research topicsOriginal source
Engineering Geological Investigation of Yangtze River Dike — Research Paper | ScholarLens