Dike Closure Technology in Reclamation Project Under the Complex Hydrological Condition
Wenhua Wu
Abstract
Wenhua Wu
Abstract
The construction difficulty of dike closure would be increased when multi-basin rivers are converged on the reclamation project area.Taking Shenglitang north reclamation project in Zhejiang Province as an example,the paper introduced technology and engineering measures dealing with high and low tide grooves and protecting the closure dike,analyzed the impact of construction on the drainage of the upper reaches,presented an optimizing method by forecasting tide process to the dike closure process.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The construction difficulty of dike closure would be increased when multi-basin rivers are converged on the reclamation project area.Taking Shenglitang north reclamation project in Zhejiang Province as an example,the paper introduced technology and engineering measures dealing with high and low tide grooves and protecting the closure dike,analyzed the impact of construction on the drainage of the upper reaches,presented an optimizing method by forecasting tide process to the dike closure process.
Key concepts: Dike, Land reclamation, Closure (psychology), Geology, Drainage, Structural basin, Hydrology (agriculture), Water resource management