2001Surveying and Mapping of SichuanRequires access

PRECISION ANALYSIS AND THE METHOD OF PLANE DEFORMATION MONITORING UNDER 140 METERS CONTINUOUS RIGID STRUCTURE BRIDGE CANTILEVER CONSTRUCTION OF HAICANG BRIDGE

Chi Yang

Open publisher page 0 citations

Abstract

The method and necessity about continuous box girder plane deformation of long span continuous rigid structure bridge are introduced in the paper.The result of precision analysis and monitoring showed that this method has some reference value about deformation monitoring to other same kind bridge construction.

About this research paper

What this paper is about

The method and necessity about continuous box girder plane deformation of long span continuous rigid structure bridge are introduced in the paper.The result of precision analysis and monitoring showed that this method has some reference value about deformation monitoring to other same kind bridge construction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The method and necessity about continuous box girder plane deformation of long span continuous rigid structure bridge are introduced in the paper.The result of precision analysis and monitoring showed that this method has some reference value about deformation monitoring to other same kind bridge construction.

Key concepts: Bridge (graph theory), Deformation monitoring, Cantilever, Structural engineering, Deformation (meteorology), Plane (geometry), Box girder, Span (engineering)

Related papers

Back to paper searchBrowse research topicsOriginal source
PRECISION ANALYSIS AND THE METHOD OF PLANE DEFORMATION MONITORING UNDER 140 METERS CONTINUOUS RIGID STRUCTURE BRIDGE CANTILEVER CONSTRUCTION OF HAICANG BRIDGE — Research Paper | ScholarLens