2010•Yangtze RiverRequires access

High slope stability analysis of flood and sediment releasing tunnel outlet of Shenxigou Hydropower Station

Xie Jian-ming

Open publisher page 0 citations

Abstract

The natural slope at outlet of flood and sediment releasing tunnel of Shenxigou Hydropower Station is high and steep,and the construction site is narrow with strong unloading,therefore,the structural layout of entrance sluice chamber is difficult.After the entrance slope was excavated,the slope foot support role was lost,resulting in difficulty of blasting.Through investigation of the geological condition,we analyzed its geological features and calculated stability index quantitatively to evaluate its stability.The structure of tunnel entrance chamber was optimized resulting in lower investment,construction period,and construction risk.

About this research paper

What this paper is about

The natural slope at outlet of flood and sediment releasing tunnel of Shenxigou Hydropower Station is high and steep,and the construction site is narrow with strong unloading,therefore,the structural layout of entrance sluice chamber is difficult.After the entrance slope was excavated,the slope foot support role was lost,resulting in difficulty of blasting.Through investigation of the geological condition,we analyzed its geological features and calculated stability index quantitatively to evaluate its stability.The structure of tunnel entrance chamber was optimized resulting in lower investment,construction period,and construction risk.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The natural slope at outlet of flood and sediment releasing tunnel of Shenxigou Hydropower Station is high and steep,and the construction site is narrow with strong unloading,therefore,the structural layout of entrance sluice chamber is difficult.After the entrance slope was excavated,the slope foot support role was lost,resulting in difficulty of blasting.Through investigation of the geological condition,we analyzed its geological features and calculated stability index quantitatively to evaluate its stability.The structure of tunnel entrance chamber was optimized resulting in lower investment,construction period,and construction risk.

Key concepts: Sluice, Geotechnical engineering, Hydropower, Geology, Excavation, Flood myth, Rock blasting, Slope stability

Related papers

Back to paper searchBrowse research topicsOriginal source
High slope stability analysis of flood and sediment releasing tunnel outlet of Shenxigou Hydropower Station — Research Paper | ScholarLens