Design and optimization of flood and sediment releasing tunnel of Shenxigou Hydropower Station

Tan Shaobing

Open publisher page 0 citations

Abstract

The Diversion tunnel of Shenxigou Hydropower Station is reconstructed for flood and sediment releasing.It was used as diversion tunnel in construction period,and later its outlet was reconstructed as permanent flood and sediment releasing tunnel for bearing 35%-40% of the flood discharge in the operation period.Based on engineering practice of Shenxigou Hydropower Station,we describe layout design of flood and sediment releasing tunnel,flood discharge capacity check,design of energy dissipation and erosion control as well as design optimization.The operation status of flood and sediment releasing tunnel shows that the design scheme is reasonable,which solves the problems of large seepage of chamber,anti-scouring of tunnel floor and energy dissipation and scouring control of the tunnel outlet.

About this research paper

What this paper is about

The Diversion tunnel of Shenxigou Hydropower Station is reconstructed for flood and sediment releasing.It was used as diversion tunnel in construction period,and later its outlet was reconstructed as permanent flood and sediment releasing tunnel for bearing 35%-40% of the flood discharge in the operation period.Based on engineering practice of Shenxigou Hydropower Station,we describe layout design of flood and sediment releasing tunnel,flood discharge capacity check,design of energy dissipation and erosion control as well as design optimization.The operation status of flood and sediment releasing tunnel shows that the design scheme is reasonable,which solves the problems of large seepage of chamber,anti-scouring of tunnel floor and energy dissipation and scouring control of the tunnel outlet.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Diversion tunnel of Shenxigou Hydropower Station is reconstructed for flood and sediment releasing.It was used as diversion tunnel in construction period,and later its outlet was reconstructed as permanent flood and sediment releasing tunnel for bearing 35%-40% of the flood discharge in the operation period.Based on engineering practice of Shenxigou Hydropower Station,we describe layout design of flood and sediment releasing tunnel,flood discharge capacity check,design of energy dissipation and erosion control as well as design optimization.The operation status of flood and sediment releasing tunnel shows that the design scheme is reasonable,which solves the problems of large seepage of chamber,anti-scouring of tunnel floor and energy dissipation and scouring control of the tunnel outlet.

Key concepts: Hydropower, Geotechnical engineering, Dissipation, Flood myth, Sediment, Flood control, Erosion, Hydrology (agriculture)

Related papers

Back to paper searchBrowse research topicsOriginal source
Design and optimization of flood and sediment releasing tunnel of Shenxigou Hydropower Station — Research Paper | ScholarLens