Construction Control of Concrete Cable-stayed Bridge by Cantilever Casting Method
Shi Xue
Abstract
Shi Xue
Abstract
The strategy, method and process of construction control for Wenzhou Bridge are introduced. The application of self adaptive control method to the construction control for concrete cable stayed bridges is also discussed here. The data show that self adaptive construction control method is the best one for cable stayed bridges.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The strategy, method and process of construction control for Wenzhou Bridge are introduced. The application of self adaptive control method to the construction control for concrete cable stayed bridges is also discussed here. The data show that self adaptive construction control method is the best one for cable stayed bridges.
Key concepts: Bridge (graph theory), Cantilever, Engineering, Structural engineering, Control (management), Casting, Process (computing), Adaptive control