2008Shanxi ArchitectureRequires access

Analysis on construction control of prestressed concrete cable-stayed bridge with one pylon and single cable plane

Wang Xiu-ya

Open publisher page 0 citations

Abstract

Taking The fourth Wohe Bridge in Huanyuan county of Anhui as example the construction process of this bridge is simulated in detail.The construction features of this prestressed concrete cable-stayed bridge with small span,one pylon and single cable plane are analyzed,at the same time corresponding construction control measures and control objectives are proposed.

About this research paper

What this paper is about

Taking The fourth Wohe Bridge in Huanyuan county of Anhui as example the construction process of this bridge is simulated in detail.The construction features of this prestressed concrete cable-stayed bridge with small span,one pylon and single cable plane are analyzed,at the same time corresponding construction control measures and control objectives are proposed.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Taking The fourth Wohe Bridge in Huanyuan county of Anhui as example the construction process of this bridge is simulated in detail.The construction features of this prestressed concrete cable-stayed bridge with small span,one pylon and single cable plane are analyzed,at the same time corresponding construction control measures and control objectives are proposed.

Key concepts: Pylon, Bridge (graph theory), Prestressed concrete, Structural engineering, Engineering, Span (engineering), Plane (geometry), Geometry

Related papers

Back to paper searchBrowse research topicsOriginal source
Analysis on construction control of prestressed concrete cable-stayed bridge with one pylon and single cable plane — Research Paper | ScholarLens