2001Journal of Tongji UniversityRequires access

New Evolution of Prestressed Concrete Cable-stayed Bridge Construction Control

De Chen

Open publisher page 0 citations

Abstract

The control of geometry and internal forces in the cable stayed prestressed concrete bridge is very important.This paper introduces the new progress of this control in China for the past few years,using adaptive control idea of modern engineering control theory to form the control system,which makes a breakthrough in the structural parameter identification and in real time camber modification of the deck at site.Several long span prestressed concrete(PC) cable stayed bridges have been successfully applied with the method.

About this research paper

What this paper is about

The control of geometry and internal forces in the cable stayed prestressed concrete bridge is very important.This paper introduces the new progress of this control in China for the past few years,using adaptive control idea of modern engineering control theory to form the control system,which makes a breakthrough in the structural parameter identification and in real time camber modification of the deck at site.Several long span prestressed concrete(PC) cable stayed bridges have been successfully applied with the method.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The control of geometry and internal forces in the cable stayed prestressed concrete bridge is very important.This paper introduces the new progress of this control in China for the past few years,using adaptive control idea of modern engineering control theory to form the control system,which makes a breakthrough in the structural parameter identification and in real time camber modification of the deck at site.Several long span prestressed concrete(PC) cable stayed bridges have been successfully applied with the method.

Key concepts: Prestressed concrete, Structural engineering, Camber (aerodynamics), Bridge (graph theory), Engineering, Deck, Geotechnical engineering, Internal medicine

Related papers

Back to paper searchBrowse research topicsOriginal source
New Evolution of Prestressed Concrete Cable-stayed Bridge Construction Control — Research Paper | ScholarLens