2011Coal science and technologyRequires access

Study on Rational Mining Height of Fully Mechanized Top Coal Caving Mining and Top Coal Caving Technology

Bin Yu

Open publisher page 2 citations

Abstract

In order to improve the top coal recovery rate of the thick seam in Carboniferous System of Tashan Mine,the numerical analysis,similar simulation analysis,site measured statistical analysis,industrial trial and other method were applied to study the key mechanical mining height and top coal caving technology in fully mechanized top coal caving mining technology with the high mining height.The study and practical results showed that under the geological and mining conditions of No.8105 coal mining face in Tashan Mine,the rational mechanized mining height was 4.0~4.3 m,the rational top coal caving step distance was 0.8 m per cutting and caving and the rational top coal caving way was multi round interval sequence and multi window caving.

About this research paper

What this paper is about

In order to improve the top coal recovery rate of the thick seam in Carboniferous System of Tashan Mine,the numerical analysis,similar simulation analysis,site measured statistical analysis,industrial trial and other method were applied to study the key mechanical mining height and top coal caving technology in fully mechanized top coal caving mining technology with the high mining height.The study and practical results showed that under the geological and mining conditions of No.8105 coal mining face in Tashan Mine,the rational mechanized mining height was 4.0~4.3 m,the rational top coal caving step distance was 0.8 m per cutting and caving and the rational top coal caving way was multi round interval sequence and multi window caving.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to improve the top coal recovery rate of the thick seam in Carboniferous System of Tashan Mine,the numerical analysis,similar simulation analysis,site measured statistical analysis,industrial trial and other method were applied to study the key mechanical mining height and top coal caving technology in fully mechanized top coal caving mining technology with the high mining height.The study and practical results showed that under the geological and mining conditions of No.8105 coal mining face in Tashan Mine,the rational mechanized mining height was 4.0~4.3 m,the rational top coal caving step distance was 0.8 m per cutting and caving and the rational top coal caving way was multi round interval sequence and multi window caving.

Key concepts: Mining engineering, Coal, Coal mining, Recovery rate, Engineering, Geology, Waste management, Chromatography

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on Rational Mining Height of Fully Mechanized Top Coal Caving Mining and Top Coal Caving Technology — Research Paper | ScholarLens