Feasibility Study on Disengaging HV Shunt Reactors of 500kV Huishan Line Unlocked at Maohu Substation

Bin Zheng

Open publisher page 1 citations

Abstract

After 500 kV Huishan line of Guangdong power grid unlocked at Maohu Substation,the failure rate of HV shunt reactors was high due to the change in the original configuration conditions of HV shunt reactors coupled with the rapid variation of power network structure and operation mode.Therefore,this paper carries out electromagnetic transient studies on decommissioning of HV shunt reactors at Shantou and Huizhou ends of the line,covering such aspects as power frequency overvoltage,closing and single-phase reclosing switching overvoltage,secondary-arc current and recovery voltage,and load rejection switching overvoltage under the operating and decommissioning conditions of HV shunt reactors.Studies have shown that the decommissioning of original HV shunt reactors of Huizhou-Maohu-Shantou channel is feasible.

About this research paper

What this paper is about

After 500 kV Huishan line of Guangdong power grid unlocked at Maohu Substation,the failure rate of HV shunt reactors was high due to the change in the original configuration conditions of HV shunt reactors coupled with the rapid variation of power network structure and operation mode.Therefore,this paper carries out electromagnetic transient studies on decommissioning of HV shunt reactors at Shantou and Huizhou ends of the line,covering such aspects as power frequency overvoltage,closing and single-phase reclosing switching overvoltage,secondary-arc current and recovery voltage,and load rejection switching overvoltage under the operating and decommissioning conditions of HV shunt reactors.Studies have shown that the decommissioning of original HV shunt reactors of Huizhou-Maohu-Shantou channel is feasible.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

After 500 kV Huishan line of Guangdong power grid unlocked at Maohu Substation,the failure rate of HV shunt reactors was high due to the change in the original configuration conditions of HV shunt reactors coupled with the rapid variation of power network structure and operation mode.Therefore,this paper carries out electromagnetic transient studies on decommissioning of HV shunt reactors at Shantou and Huizhou ends of the line,covering such aspects as power frequency overvoltage,closing and single-phase reclosing switching overvoltage,secondary-arc current and recovery voltage,and load rejection switching overvoltage under the operating and decommissioning conditions of HV shunt reactors.Studies have shown that the decommissioning of original HV shunt reactors of Huizhou-Maohu-Shantou channel is feasible.

Key concepts: Overvoltage, Engineering, Shunt (medical), Nuclear decommissioning, Electrical engineering, Transformer, Nuclear engineering, Voltage

Related papers

Back to paper searchBrowse research topicsOriginal source
Feasibility Study on Disengaging HV Shunt Reactors of 500kV Huishan Line Unlocked at Maohu Substation — Research Paper | ScholarLens