Feasibility Study on Decommissioning of HV Shunt Reactors in 500 kV Wuxin-Shuangjiang Transmission Line

Weihua Zhou

Open publisher page 0 citations

Abstract

The length of the 500 kV Wuxin-Shuangjiang transmission line in Hunan power grid after passing the 500 kV substation T connection was reduced from the original 300 km to about 129 km,which facilitated the decommissioning of 500 kV shunt reactors.To prevent failures of HV shunt reactors,operation overvoltage of Wuxin-Shuangjiang line after the decommissioning of HV shunt reactors was calculated and the decommissioning feasibility was discussed.The study includes switching overvoltage under different conditions.Results proved the feasibility of HV shunt reactor decommissioning in the Wuxin-Shuangjiang transmission line.

About this research paper

What this paper is about

The length of the 500 kV Wuxin-Shuangjiang transmission line in Hunan power grid after passing the 500 kV substation T connection was reduced from the original 300 km to about 129 km,which facilitated the decommissioning of 500 kV shunt reactors.To prevent failures of HV shunt reactors,operation overvoltage of Wuxin-Shuangjiang line after the decommissioning of HV shunt reactors was calculated and the decommissioning feasibility was discussed.The study includes switching overvoltage under different conditions.Results proved the feasibility of HV shunt reactor decommissioning in the Wuxin-Shuangjiang transmission line.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The length of the 500 kV Wuxin-Shuangjiang transmission line in Hunan power grid after passing the 500 kV substation T connection was reduced from the original 300 km to about 129 km,which facilitated the decommissioning of 500 kV shunt reactors.To prevent failures of HV shunt reactors,operation overvoltage of Wuxin-Shuangjiang line after the decommissioning of HV shunt reactors was calculated and the decommissioning feasibility was discussed.The study includes switching overvoltage under different conditions.Results proved the feasibility of HV shunt reactor decommissioning in the Wuxin-Shuangjiang transmission line.

Key concepts: Nuclear decommissioning, Overvoltage, Transmission line, Engineering, Nuclear engineering, Shunt (medical), Electrical engineering, Electric power transmission

Related papers

Back to paper searchBrowse research topicsOriginal source
Feasibility Study on Decommissioning of HV Shunt Reactors in 500 kV Wuxin-Shuangjiang Transmission Line — Research Paper | ScholarLens