Exploration on Ways of Sediment Treatment of Xiaolangdi Reservoir

Zhang Xiaochang

Open publisher page 2 citations

Abstract

According to the practice of high concentration slurry pipe transport of warping projects conducted in the lower Yellow River and the achievements of scientific research,it puts forward to disturb and pump sediment during the two periods of a regulated discharge regime of the river and power generation and water supply within the range of 2-40 km in front of the dam done by submerged suction-type sediment disturbing boats,discharging the fine particle sediment that deposited on the reservoir bottom out of the reservoir in the light of the principle of siphon and reservoir scour.The analysis shows that the plan is economic and workable.It can achieve the objectives of extending the lifetime of the Xiaolangdi Reservoir and transporting sediment into the sea through the coordination and cooperation of reservoir regulation and cleaning.

About this research paper

What this paper is about

According to the practice of high concentration slurry pipe transport of warping projects conducted in the lower Yellow River and the achievements of scientific research,it puts forward to disturb and pump sediment during the two periods of a regulated discharge regime of the river and power generation and water supply within the range of 2-40 km in front of the dam done by submerged suction-type sediment disturbing boats,discharging the fine particle sediment that deposited on the reservoir bottom out of the reservoir in the light of the principle of siphon and reservoir scour.The analysis shows that the plan is economic and workable.It can achieve the objectives of extending the lifetime of the Xiaolangdi Reservoir and transporting sediment into the sea through the coordination and cooperation of reservoir regulation and cleaning.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

According to the practice of high concentration slurry pipe transport of warping projects conducted in the lower Yellow River and the achievements of scientific research,it puts forward to disturb and pump sediment during the two periods of a regulated discharge regime of the river and power generation and water supply within the range of 2-40 km in front of the dam done by submerged suction-type sediment disturbing boats,discharging the fine particle sediment that deposited on the reservoir bottom out of the reservoir in the light of the principle of siphon and reservoir scour.The analysis shows that the plan is economic and workable.It can achieve the objectives of extending the lifetime of the Xiaolangdi Reservoir and transporting sediment into the sea through the coordination and cooperation of reservoir regulation and cleaning.

Key concepts: Sediment, Siphon (mollusc), Slurry, Dredging, Sediment transport, Environmental science, Hydrology (agriculture), Geology