2012Shanxi ArchitectureRequires access

Research on foundation supporting scheme nearing existing railway

MA Wen-don

Open publisher page 0 citations

Abstract

Taking the highway railway foundation support as the research object,the paper carries out support design of single bearing scheme,and comparatively analyzes the settlement without penetration by using PLAXIS finite element software.Results show that: while the foundation excavation is nearing existing railway,dewatering operation has to be done nearing the existing railway,if the pile length is over 9 m,the rail level value will be within permitted.

About this research paper

What this paper is about

Taking the highway railway foundation support as the research object,the paper carries out support design of single bearing scheme,and comparatively analyzes the settlement without penetration by using PLAXIS finite element software.Results show that: while the foundation excavation is nearing existing railway,dewatering operation has to be done nearing the existing railway,if the pile length is over 9 m,the rail level value will be within permitted.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Taking the highway railway foundation support as the research object,the paper carries out support design of single bearing scheme,and comparatively analyzes the settlement without penetration by using PLAXIS finite element software.Results show that: while the foundation excavation is nearing existing railway,dewatering operation has to be done nearing the existing railway,if the pile length is over 9 m,the rail level value will be within permitted.

Key concepts: Pile, Foundation (evidence), Excavation, Engineering, Settlement (finance), Scheme (mathematics), Civil engineering, Dewatering

Related papers

Back to paper searchBrowse research topicsOriginal source
Research on foundation supporting scheme nearing existing railway — Research Paper | ScholarLens