Research on Bracing Design and Construction Schemes of Bridge Pier Foundation Excavation of Intercity Railway Next to Existing Railway

Cccc Second

Open publisher page 0 citations

Abstract

Shanghai-Nanjing intercity railway crosses the existing railway of Shanghai-Nanjing railway in HQSDK2+715.403.The minimum distance between the No.74 bridge pier pile cap of the intercity railway and the existing railway is 0.78m,so the construction condition is greatly restricted.In addition,the existing railway's traffic is very heavy,and the existing railway's settlement must be less than 2mm when the foundation excavation is in construction.For these questions,this paper provides construction schemes of the pier foundation excavation,analyses the structure intensity,the settlement and its stability under the action of train's load by using methods of the resolution and finite element method.It shows that the plan can meet the engineering construction requirements and can provide useful information for similar engineering.

About this research paper

What this paper is about

Shanghai-Nanjing intercity railway crosses the existing railway of Shanghai-Nanjing railway in HQSDK2+715.403.The minimum distance between the No.74 bridge pier pile cap of the intercity railway and the existing railway is 0.78m,so the construction condition is greatly restricted.In addition,the existing railway's traffic is very heavy,and the existing railway's settlement must be less than 2mm when the foundation excavation is in construction.For these questions,this paper provides construction schemes of the pier foundation excavation,analyses the structure intensity,the settlement and its stability under the action of train's load by using methods of the resolution and finite element method.It shows that the plan can meet the engineering construction requirements and can provide useful information for similar engineering.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Shanghai-Nanjing intercity railway crosses the existing railway of Shanghai-Nanjing railway in HQSDK2+715.403.The minimum distance between the No.74 bridge pier pile cap of the intercity railway and the existing railway is 0.78m,so the construction condition is greatly restricted.In addition,the existing railway's traffic is very heavy,and the existing railway's settlement must be less than 2mm when the foundation excavation is in construction.For these questions,this paper provides construction schemes of the pier foundation excavation,analyses the structure intensity,the settlement and its stability under the action of train's load by using methods of the resolution and finite element method.It shows that the plan can meet the engineering construction requirements and can provide useful information for similar engineering.

Key concepts: Pier, Engineering, Excavation, Bracing, Settlement (finance), Bridge (graph theory), Foundation (evidence), Railway engineering