Reconstruction technical measures for foundation base replacement of tunnel in existing railway line
WU Mei-fan
Abstract
WU Mei-fan
Abstract
Combined with practical work,reconstruction technical measures for foundation base replacement of tunnel in existing railway line are introduced.Practical construction technology in limited time is presented.Optimization of construction scheme and perfection various technical measures ensure safe,rapid and high efficient of construction in running railway line.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Combined with practical work,reconstruction technical measures for foundation base replacement of tunnel in existing railway line are introduced.Practical construction technology in limited time is presented.Optimization of construction scheme and perfection various technical measures ensure safe,rapid and high efficient of construction in running railway line.
Key concepts: Foundation (evidence), Line (geometry), Engineering, Work (physics), Construction engineering, Base (topology), Transport engineering, Civil engineering