Construction and Monitoring Analysis for Subway Tunnel
Chang Yu Jin
Abstract
Chang Yu Jin
Abstract
Based on a subway tunnel work, the construction method was introduced, and the main process of the construction method was analyzed. The site monitoring was made during the tunneling construction. The results of monitoring data for subsidence and arch crown settlement are analyzed, and will guiding the future construction.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Based on a subway tunnel work, the construction method was introduced, and the main process of the construction method was analyzed. The site monitoring was made during the tunneling construction. The results of monitoring data for subsidence and arch crown settlement are analyzed, and will guiding the future construction.
Key concepts: Settlement (finance), Tunnel construction, Arch, Deformation monitoring, Civil engineering, Engineering, Ground subsidence, Subsidence